Bay Area Modern Bathroom Remodels Designed With Intention. Built Behind The Tile, Not Just On It.

Custom warm-modern bathrooms by Casa De RJ — design-driven, quiet, and waterproofed like you'll own the house for thirty years.

Prefer to talk it through? Call and you'll get a straight answer on whether we're a fit.

CSLB #1084784 · Licensed & Insured Schluter Waterproofing Peninsula & Tri-Valley Design Before Demo
The real reason you haven't started

You're not avoiding a bathroom. You're avoiding a process.

It works. Water comes out, water goes down. But the grout never looks clean anymore, the fan doesn't clear the mirror, and there's nowhere to set anything down. You've had the saved folder for two years. What you haven't done is start — because a bathroom is the one room you can't take offline for a month while somebody figures it out on the fly.

The room you use twice a day

You start and end every single day in it. That's the room you've decided to keep putting off — while the ones you use less get the attention.

What's behind the tile

A bathroom is the only room in the house you deliberately soak every day. The expensive failures aren't the finishes — they're the waterproofing, the slope, the pan, and the ventilation nobody sees.

A moving target

Slab, glass, and fixture lead times don't hold still, and neither do labor rates. The version you priced at 2am eighteen months ago isn't the version you'd be quoted today.

The thing you actually wanted

You didn't picture a bathroom. You pictured the ten quiet minutes in it. Two people getting ready without negotiating. Guests who don't get the apology tour on the way down the hall.

That process is genuinely awful — when nobody's running it. The whole job here is to run it.

How we build

We design first. Then we demolish.

Most contractors sell you a price, tear out your bathroom, and start figuring things out. That's why timelines slip and change orders pile up — decisions that belonged on paper get made in a dusty room with your family sharing one sink. We reverse it. You see the layout, the elevations, the fixture schedule, and the number before anything is touched. You approve a plan, not a promise.

Design-forward

Your bathroom gets designed around how two people actually use it at 7am — not pulled off a layout template. Function and fixture clearances decided before finishes.

Relationship-first

One point of contact for the whole job. You text a person, not a company inbox, and that person knows your project without looking it up.

Chaos-free

Scope locked before demo. Weekly written updates. You know which specific days you're without the shower, before we open a wall.

What you're actually buying

Everything included in a Casa De RJ bathroom

No vague promises. Five things, in the order they happen.

01

Design, layout, and selections

We measure, we listen to how the room actually gets used, and we resolve it on paper: what's realistic in your footprint, which walls move, where the drain can go. Then measured drawings, clearances, niche placement, storage — plus curated tile, stone, fixture, and glass options inside your budget, so selections take an afternoon instead of a season.

[Free / $___]
02

Schluter waterproofing, specified in writing

We build wet areas on Schluter systems, and the spec is written into your scope before demo — not decided by whoever shows up on tile day. It's the part of a bathroom you never see and the only part that decides whether the room is still sound in year ten.

Included
03

Fixed, line-item investment plan

A number, not a ballpark. Every line visible, so change orders are the rare exception instead of the business model.

[$___ value]
04

Permit & jurisdiction handling

We run the city so you never sit in a permit office. [LIST YOUR REAL JURISDICTIONS — e.g. Berkeley, Danville, Walnut Creek, Palo Alto].

Included
05

Vetted trades, weekly updates, and a documented close

[NAME THE TRADES YOU SELF-PERFORM AND THE SUBS YOU'VE RUN FOR YEARS.] You get a written update every week — what happened, what's next — and the job closes with a written completion and release agreement plus warranty terms. Not a handshake and a wave.

Included
The Six-Point Compass

How we walk the path with you.

The same process we run on every Casa De RJ project — applied to one room, at close range.

POINT 01

We listen to your story

Who uses this room, when, and what about it currently makes the morning worse. We understand the "why" before we look at a layout.

POINT 02

Simplifying the route

We filter the noise of the San Francisco Design District down to a curated set of tile, stone, and fixtures that fit your taste and your number.

POINT 03

Clear landmarks

No mystery, no detours. Weekly written updates and a transparent schedule mean you always know exactly where we are on the map.

POINT 04

Handling the logistics

Permits, inspections, and the coordination of master craftsmen. We handle the friction. You enjoy the progress.

POINT 05

Crafting destinations

A bathroom is judged from eighteen inches away. We build for the up-close view — the transitions, the reveals, the tile that lands where it should.

POINT 06

Here for the long haul

Our relationship doesn't end at the last inspection. Warranty terms in writing, and a builder who picks up the phone in year three.

Project gallery

Richmond: Marmora, Finished, and the Build Behind It

Bathroom gallery | Richmond | Finished room, construction progress inside

Marmora is the finished marble bath. Open it and the follow-up questions walk through this same Richmond bathroom mid build, from the dated room it started as to the open walls and tile work behind the finish.

What does Marmora look like when the marble is done?

Marmora is the marble bath in the Richmond hills: big stone surfaces, a calm palette, and nothing in the room fighting for attention. It is the finished end of the process this page describes.

The four follow-ups below are this same bathroom mid build: the room as it started, the design set into the open framing, the plumbing in the wall, and the board and waterproofing behind the tile.

How it got there: four construction stages

Is your design figured out for any allowances that you need in the wall?

It has to be, before the wall closes. In this Richmond bathroom, the niches, the blocking, and the plumbing locations were all set while the framing was still open, because once board and tile go on, moving any of them means opening the wall back up. That is why the planning and permitting stretch runs 6 to 10 weeks: the decisions that live inside the wall get made first, on paper and then in the framing.

What drives up the cost for my bathroom remodel?

The starting point, and how much has to change. This Richmond bathroom began with a dated tile counter, worn walls, and a walk-in tub and surround that all had to come out before any new work could start. A full gut back to the framing, new plumbing in the wall, and the finish level chosen on top are the big drivers. On the ranges this page works from, a hall bath runs $40,000 to $60,000 plus finishes.

What is the material behind tile?

Tile backer board, with waterproofing rolled over the seams and screw heads before any tile is set. In this Richmond shower the board is up, the red waterproofing coat is on, and the niche is framed and coated the same way, so the whole wet wall is sealed as one system. The standing rule on this page: the waterproofing gets specified in writing before demo, so what sits behind your tile is agreed up front, not assumed.

What type of plumbing is your contractor putting in the wall?

Copper supply lines and black ABS drain pipe, roughed in while the wall is open. In this Richmond shower the copper runs, the shower valve body, and the drain stacks all went in at the framing stage, where every joint can be seen and checked before the board closes over them. Ask the question on any bid: the pipe in the wall outlasts every finish in the room.

Recent work

Bathrooms we've built

Warm materials, quiet detailing, and waterproofing you'll never have to think about.

Marmora — marble bathroom in Richmond HillsFull bath
Richmond Hills, CA

Marmora

Full-height marble on every wet wall, warmed by brass and a deep navy vanity so the room reads calm instead of cold.

Electrum — bronze glass shower, San FranciscoGuest bath
San Francisco, CA

Electrum

A tight footprint made to feel like a destination — bronze glass and concealed light turning the shower into the focal point instead of the leftover corner.

Unda — double vanity primary bath, San FranciscoPrimary bath
San Francisco, CA

Unda

Two people getting ready at once without negotiating — a double vanity, a sculpted wall that carries the light, and a bench seat in the shower.

Tessera — checkerboard tile hall bath, San FranciscoHall bath
San Francisco, CA

Tessera

Proof that a tub bath doesn't have to be the safe one. Hand-glazed checkerboard, a lit niche, and brass carried through every fitting.

Viridia — green tile hall bath, LafayetteHall bath
Lafayette, CA

Viridia

A hall bath with a point of view — graphic green tile and a pebble floor, held together by walnut and matte black so it stays warm.

Solaria — skylit primary suite bath, LafayettePrimary suite
Lafayette, CA

Solaria

Daylight brought in from above, then a clean run from vanity to shower to closet — the whole morning routine in one uninterrupted path.

Want a straight answer today?

Skip the form. Call and we'll tell you in five minutes whether your bathroom is a fit — and roughly what it takes.

(510) 590-6291
Project gallery

Berkeley: Vespera, Finished, and Its Tile Work in Progress

Bathroom gallery | Berkeley | Finished room, construction progress inside

Vespera is the Berkeley full bath: marble look tile, a fluted wood vanity, and herringbone underfoot. Its follow-up questions are the same bathroom during the tile work, before the fixtures went in.

What does Vespera look like with the herringbone down?

Finished, Vespera is a quiet room: a fluted wood vanity, marble look tile around the tub, the window kept over the tub, and the herringbone floor doing the pattern work for the whole bath.

The follow-ups are this same bathroom a few weeks earlier, when the tile was still being staged, leveled, and laid piece by piece.

How it got there: four construction stages

How does large format tile get staged?

The tiles are sorted and laid out on the floor before the first one is set. With large format tile, layout is the craft: vein direction, grout lines, and where the cuts land are decided before anything touches the wall.

Why is there a level sitting in the shower?

Because the board has to be flat and true before tile starts, and the level is how that gets proven. This is the Vespera shower in cement board, checked before a single tile went up.

How does herringbone start?

In sections, and slowly. This photo catches the floor mid pattern, half down and half still subfloor. Every piece is cut at an angle, which is why herringbone takes longer to lay than a straight run.

How does herringbone look before the grout?

Sharper and darker than it will finish. Grout softens the contrast and locks the pattern. Even ungrouted, the zigzag already reads across the whole surface, on the wall as well as the floor.

Project gallery

Bathrooms We Have Built: Marmora, Electrum, Unda, Tessera, Viridia, Solaria

Bathroom gallery | Multiple (see each photo)

What type of bathroom projects does Casa de RJ specialize in?

Full, design forward bathroom remodels, often with layout changes, custom vanities, plumbing relocation, and high end finishes, per the Bathroom page.

The named galleries are Marmora, Electrum, Unda, Tessera, Viridia, and Solaria, with Aurelia and Vespera also named on the page.

Keep going

Do I need a designer first?

Either way works. Casa de RJ can bring a designer or coordinate with yours. Demo never starts before design is resolved on paper.

What is behind the tile?

Waterproofing, specified in writing. The page title says it plainly: built behind the tile, not just on it.

What is the typical investment range?

Quoted in two parts, per the Bathroom page. Powder room: about $20,000 to $30,000 in labor and rough materials, plus $10,000 to $50,000 in finishes. Full hall bath: about $40,000 to $60,000 plus finishes in the same range.

Labor and rough materials are predictable. Finishes are the lever you control.

Keep going

Why split labor and finishes?

Because they behave differently. Splitting them shows you exactly where your choices move the total.

What if it does not fit my budget?

The page says it directly: then Casa de RJ is the wrong fit, and you will hear that before a walkthrough, not after.

Client results

What it's like to work with us

Proof that the process is premium — not just the finishes.

RJ is HONEST, very generous with his time, extremely knowledgeable, and just really great to work with. He takes the time to actually understand the problem, walks you through the options, and tells you straight up what it'll take to get the job done RIGHT.

Nate B. · Google review

From the start, he was very thoughtful during the design process, always thinking about what would work best. He kept me in the loop the whole time and was really easy to communicate with — any phone call or text, he was diligent about making sure I was satisfied every step. It made the whole process stress-free.

Luxus Realms · Google review

Ryan is refreshingly honest with my clients about scope of work and pricing estimates — he doesn't sugar coat, he gives honest numbers. While most general contractors work hard, Ryan takes it to another level.

Sandor H. · Realtor · Google review

RJ's attention to detail, patience, and ability to break down everything from structural walls to layout flow made the entire process seamless.

MCL Hair · Salon build-out · Google review

He was very responsive, helpful, respectful, and generous with his time. As he walked us through several different scenarios, it was immediately clear how experienced and knowledgeable he is.

Jared L. · Google review

I had the tile floor grout cleaned in my kitchen and bathroom, joints recaulked and granite counter tops sealed. RJ and his subcontractor did a great job. Fair price, on time, very knowledgeable.

Jeff A. · Google review

Every review above is public. Read them in full on Google and Yelp.

More bathroom questions

How long does a full bathroom remodel take?

Plan on 5 to 8 months from first walkthrough to finished room, per the Bathroom page. About 6 to 10 weeks is planning and permitting. The rest is lead times and the build.

Permits are pulled on these projects, which is why the work is inspected and defensible when you sell.

Keep going

We only have one bathroom. How long are we without it?

About 4 to 5 weeks once construction starts. Planning happens while your bathroom still works normally.

Can we move faster?

Sometimes. It is a budget conversation: in stock finishes, expediting, and overtime are the levers, priced at the walkthrough.

How do you prevent leaks?

With a waterproofing system specified in writing, correct substrate and slopes, and trades who build bathrooms this way every week.

Most bathroom failures start behind the tile, years before they show. That is the layer this program is built around.

Keep going

What is Schluter?

A waterproofing system named in the Bathroom page inclusions: Schluter waterproofing, specified in writing.

How is budget kept transparent?

A fixed, line item investment plan before demo, with changes priced and approved in writing.

The offer

Start with a bathroom walkthrough

A 45–60 minute on-site visit. We measure, we listen, and we tell you what's realistic in your space — layout, scope, and a real investment range.

  • A professional read on your bathroom's real potential
  • Honest feedback on what's structurally and mechanically possible
  • A realistic investment range for your scope
  • A clear timeline from design through permits to build
  • [ANYTHING ELSE THEY PHYSICALLY LEAVE WITH — the booklet? the price list?]

What it isn't: a pressure pitch. If we're not the right fit, we'll say so at the walkthrough.

What happens next

  1. Fill out the bathroom plan form below
  2. We review your scope and timeline
  3. If it aligns, we schedule a brief strategy call
  4. We walk your bathroom on-site
  5. You decide — no follow-up pressure either way
Start Your Bathroom Plan → Or Call (510) 590-6291

[Mon–Fri, 8am–6pm PT]

Plan on 5–8 months from first walkthrough to finished room. Permitting and material lead times drive the calendar, not crew days — so a bathroom you want done by the holidays starts now, not in the fall.

Check Availability
How we de-risk it

Everything that matters is in writing

Scope and price are locked line by line before demo. Change orders are priced and approved in writing before work continues. The waterproofing system is specified in the scope, not improvised on tile day. The work is permitted and inspected. And the job closes with a written completion and release agreement plus written warranty terms.

Our license is CSLB #1084784. Look it up before you hire anyone in this business — including us.

Project gallery

Lafayette: Solaria, Viridia, and a Floor That Carries the Room

Bathroom gallery | Lafayette | Finished rooms, construction progress inside

Two named Lafayette baths and one patterned floor, all finished. The follow-ups are Lafayette construction stages: waterproofing, layout, insulation, and floor preparation. Progress photos are from the Lafayette project files and are not matched to a single one of these rooms.

What does Solaria feel like in the morning?

Daylight brought in from above, then a clean run from vanity to shower to closet: the whole morning routine in one uninterrupted path. That is the page's own description of Solaria, and the skylight is the reason for the name.

A room this calm starts as a very uncalm construction site. The follow-ups show the Lafayette stages behind it.

How it got there: four construction stages

What does waterproofing look like before the tile?

A dark membrane over every wet surface, with the niche already framed into it. On this page the waterproofing system is specified in writing before demo, because tile is a finish, not a waterproofing layer.

What is drawn on the wall before tile starts?

The layout itself: pencil lines, measurements, and arcs marking where tile, fixtures, and curves will land. Drawing the room on the wall first is how patterns arrive centered instead of almost centered.

What sits behind the shower wall?

Insulation, for sound as much as temperature. A shower on the other side of a bedroom wall is a noise decision, and the open wall stage is the only moment it can still be made.

What happens to the floor first?

Preparation before pattern: lath and underlayment over the subfloor, with the walls still open around it. A patterned floor is only as flat as what sits under it.

How much green can a hall bath take?

Viridia answers that with a full green tile wall and a round brass mirror: one strong color, carried with confidence, and everything else kept quiet around it.

Green tile this saturated leaves no room for a crooked layout. The follow-ups are the Lafayette stages that have to happen first.

How it got there: four construction stages

How is the floor bed built under tile?

Lath over the prepared subfloor gives the mortar bed its grip and its flatness. It is unglamorous work, and it is what keeps a finished floor from flexing or cracking at the grout lines.

How does a shower stay waterproof behind green tile?

The membrane does it, not the tile and not the grout. This Lafayette shower is fully waterproofed, niche framed in, before a single tile is set. The system is named in writing before demo on every Casa de RJ bath.

Why are there numbers written on the wall?

Because tile layout is arithmetic before it is artistry: coursing heights, center lines, and cut sizes, worked out in pencil where the installer can see them. The finished wall hides all of it.

Why insulate a bathroom wall?

For quiet. Insulation packed between the studs dulls water and fan noise into the rooms next door, and it can only go in while the wall is open.

Can the floor be the pattern?

In this Lafayette bath, yes: a geometric patterned floor carries the room while the walls stay quiet. One strong pattern per room is usually the right count.

Patterned floors are layout work before they are tile work. The follow-ups show the preparation stages in the same Lafayette project.

How it got there: four construction stages

What goes under a patterned tile floor?

A flat, stiff bed: lath and underlayment over the subfloor, checked before the pattern starts. Any wave in the bed becomes a wave in the pattern.

How is a pattern laid out before it is set?

Dry, in pencil, on the surface itself: center lines first, then the repeat worked outward so the pattern lands whole at the walls instead of slivered.

What happens in the shower while the floor is prepped?

Waterproofing. The shower gets its membrane and framed niche in the same stretch of the schedule, so wet areas are sealed as one system before finishes begin.

What is inside the walls of this bath?

Insulation, plumbing, and electrical, all placed and checked before board closes the wall. Once tile is on, none of it can be reached without opening the room again.

Project gallery

San Leandro: The Hall Bath, Finished Shower First

Bathroom gallery | San Leandro | Finished room, construction progress inside

The finished shower leads, and its follow-ups run the same San Leandro hall bath backwards: before, demo, framing, and the niche going in. The tub was kept, and the primary ensuite was reframed in the same project.

What does the rebuilt San Leandro shower look like up close?

Warm stone look tile, a long mosaic niche, black fixtures, and a high window that keeps the shower private without going dark. This is the San Leandro hall bath at the end of the rebuild.

The follow-ups are the same room on the way there, in the order a homeowner actually lives through it.

How it got there: four construction stages

What did the room look like before?

Plain, dated, and already opened up for assessment. Before photos matter: they are the baseline every later decision and every progress update is measured against.

What does demo actually look like?

Old tile out, fixtures out, and the subfloor opened where the plumbing runs. Demo never starts before the design is resolved on paper. That order is the whole system on this page: design first, then demolish.

When do you know the framing is sound?

When it is open and you can see all of it. This run of framing was checked stud by stud before board. Anything soft or out of plane gets fixed here, not buried.

How does a long shower niche get built?

The niche is framed into the wall first, waterproofed with the rest of the shower, and tiled around. In the finished photo above it reads as one long mosaic band, taped here for protection while the last work finished around it.

More bathroom questions

Double vanity or more shower?

Unda is a double vanity primary bath. Solaria is a skylit primary suite bath. The freestanding tub room in this set puts the tub on a wood platform between two glass showers.

Primary baths are a priorities exercise: two sinks, a bigger shower, or a tub. Most rooms can feature two of the three well.

Keep going

Can a skylight go in a bathroom?

Solaria is built around one. Skylights are structural and roofing work, permitted as part of the project.

Checkerboard tile: classic or risky?

Tessera is a checkerboard hall bath in San Francisco. The pattern is classic. Execution, layout, and grout lines decide whether it reads that way.

What happens after we submit the form?

The same pattern as the Kitchen page: review, a strategy conversation if scope and timeline align, then a walkthrough. Everything that matters ends up in writing.

Keep going

Are you licensed and insured?

Yes. CSLB 1084784, with general liability and workers compensation insurance.

Green tile: where does Viridia fit?

Viridia is a green tile hall bath in Lafayette. Color in a hall bath is low risk: small room, big effect, contained cost.

Project gallery

San Francisco: Tessera, Unda, Electrum, Aurelia, and the Powder Room

Bathroom gallery | San Francisco | Finished rooms, construction progress inside

Four bathrooms and a powder room from one San Francisco house, each finished, each with its own name. The follow-up photos are construction stages from this same project: tile work, sheetrock, framing, paint, and the LED panels behind the lit stone. They are project stages, not matched to one single bathroom.

How does a checkerboard bathroom stay calm instead of busy?

Two tones, a strict grid, and brass to warm it. Tessera is the checkerboard hall bath, and it stays calm because the pattern is the only loud thing in the room.

Checkerboard punishes sloppy layout, so the follow-ups are the tile stages from this project.

How it got there: four construction stages

How does a tiled shower bench take shape?

It is framed, waterproofed with the shower, and tiled over, measured in place as the tile climbs around it. A bench is structure first and comfort second.

How do large tiles stay flat on the wall?

With leveling clips, a flat substrate, and patience. Large format tile shows every wave in the wall behind it, so the wall gets proven flat before the tile goes up.

Where do the big tiles get cut?

At a wet saw set up outside, cut by cut from the layout. Planning the cuts is what keeps the pattern whole at the corners instead of ending in slivers.

What happens right before tile?

Board seams get taped, surfaces get sealed as one system, and the plumbing stub outs wait capped at the wall. Tile day is quiet because this day was not.

How do you light a double vanity without overhead glare?

Two backlit oval mirrors, sconces between them, and a sculpted wave wall that carries the light. This is Unda, the double vanity primary bath.

Layered light is decided on paper: mirror, sconce, and niche lighting all land in the electrical plan before demo. The follow-ups show where that starts.

How it got there: four construction stages

What makes backlit stone and mirrors glow?

A grid of LED panels fitted behind the surface, wired before the stone or mirror goes on. Even light comes from spacing the grid evenly, not from turning it up brighter.

What does the room look like at sheetrock stage?

Board up, seams started, and no sign yet of mirrors or stone. Every finished bath on this page passed through a stage that looked exactly this plain.

When does paint start?

After board and texture, before fixtures, with everything that is not being painted masked off. The arched niches in this photo get the same protection as the floors.

Where does a sculpted wall start?

As framing and board, built to a drawn curve long before it reads as sculpture. The wave in Unda is carpentry and drywall before it is a lighting effect.

What does a bronze glass shower do to a bathroom?

It warms the glass. Electrum's bronze toned shower enclosure turns a clear box into a piece of the room's palette, and it is the detail visitors ask about.

Bronze glass has to land on tile that is dead true. The follow-ups are this project's tile and board stages.

How it got there: four construction stages

How are tiles cut to fit around glass?

One at a time at the wet saw, measured off the layout. Glass is ordered to finished openings, so the tile work around it has to be right the first time.

How does a shower wall stay true for glass?

The substrate is checked flat and the tiles are leveled as they set. A glass panel cannot hide a bowed wall; it announces it.

What gets waterproofed before the glass goes in?

Everything the water can reach: floor, bench, and walls, membrane first and tile second. The glass arrives near the end, onto a shower that is already a sealed system.

When does a shower start to look like a room?

At sheetrock, when the volume of the room finally reads. Tile, glass, and fixtures are finishes on top of this stage, not the start of it.

What does warm stone do to a small bathroom?

It makes the room feel lit instead of illuminated. This shower is warm travertine from floor to ceiling, with lit niches and brass fixtures, and no cold white anywhere.

That is the Aurelia description on this page, almost word for word: warm stone and layered light instead of overhead glare. Aurelia is the suite bath in this San Francisco house.

How it got there: four construction stages

What lights the niches in a stone shower?

LED panels and strips set into the niche build, wired with the rest of the bath's layered lighting. The glow is planned at rough electrical, not added with a battery puck at the end.

How is a stone shower bench waterproofed?

The bench is built as part of the shower pan system, membrane over every surface, before stone or tile touches it. Water never gets a path into the framing.

What comes before the stone?

Framing, insulation, and board, in a room that looks nothing like the finished photo above. Stone is heavy, so the structure behind it is part of the design, not an afterthought.

Why is everything masked off?

Because finish stages overlap. Paint and final coats happen while completed surfaces already exist in the next room, and masking is cheaper than repairing.

How is the vanity lit in a warm stone bath?

From the side and from behind the mirror, not from a bar of bulbs overhead. This is Aurelia's vanity: a round backlit mirror, brass faucets, and the glass shower beside it.

Warm light at face height is the difference between a bath that flatters and one that interrogates. The follow-ups show the stages behind that glow.

How it got there: four construction stages

What sits behind a backlit mirror?

An LED panel sized to the mirror, on its own switched circuit. It goes in before the mirror hangs, and it is serviced by removing the mirror, not the wall.

What does the vanity wall look like before the vanity?

Flat board and marked lines. The vanity, mirror, and sconce positions are laid out on this surface before anything is hung on it.

Where do the faucet lines wait?

Capped at the wall, at the heights the vanity drawing called for. The blue caps in this photo are supply lines parked safely until fixture day.

Where does vanity stone get cut?

At the saw, from templates, before it reaches the bathroom. Stone is fitted in the shop and at the saw so the room itself only sees the final piece.

Can a powder room carry the same palette?

This powder room in the same San Francisco house does: a checkerboard accent band, a backlit oval mirror, and a compact vanity, all borrowed from the bigger baths around it.

Powder rooms are the smallest scope on this page, about $20,000 to $30,000 in labor and rough materials plus finishes, which makes them the safest place to be bold.

How it got there: four construction stages

How does an accent band get laid out?

Centered on the room and leveled as it sets, like any large tile work. In a small room the band is the view, so its lines have to be perfect.

When do the walls close in a powder room?

After plumbing and electrical pass inspection, same as a full bath. Small rooms follow the same sequence; they just finish it faster.

What gets painted first in a small bath?

Ceilings and walls, masked around anything already finished. In a powder room there is nowhere to stand that is not in the work, so protection goes everywhere.

How rough does the rough stage look?

Open framing, insulation, and dust. Every polished room on this page started here, which is why the planning happens before this stage, not during it.

Straight answers

Frequently asked questions

What type of bathroom projects does Casa De RJ specialize in?

We specialize in full, design-forward bathroom remodels — often involving layout changes, custom vanities, structural or plumbing relocation, and high-end finishes. Our work is best suited for homeowners who value thoughtful design and professional execution.

What is the typical investment range for a Casa De RJ bathroom remodel?

We quote it in two parts, because that's how it actually behaves. Powder room: roughly $20,000–$30,000 in labor and rough materials, plus $10,000–$50,000 in finishes. Full hallway bath: roughly $40,000–$60,000 in labor and rough materials, plus $10,000–$50,000 in finishes. The labor and rough side is fairly predictable. The finish side is entirely a function of how custom you want to go — that's the lever you control, and we'll show you exactly where it moves. If those numbers don't fit your budget, we're the wrong fit, and we'd rather tell you now than after a walkthrough.

Do you help with bathroom design, or do we need a designer first?

Yes — either way works. We can collaborate directly with the designer you're already working with, or bring ours onto the project. What we don't do is start demo before the design is resolved: layout, elevations, and finish selections get settled on paper first.

How long does a full bathroom remodel usually take?

Plan on 5–8 months from first walkthrough to finished room. Roughly 6–10 weeks of that is planning and permitting — design, selections, construction documents, sub-vendors, and the city. The rest is material lead times and the build itself. We pull permits on these projects; that's why the front half takes as long as it does, and it's why the work is inspected, legal, and defensible when you sell. We give you the number before we start and update it in writing every week. If it moves, you hear it from us first.

We only have one bathroom. How long are we without it?

4–5 weeks, once construction starts. Not the 5–8 months — the planning, permitting, and ordering all happen while your bathroom still works normally. The disruption is a defined window near the end, not an open-ended condition, and you'll know the start date months in advance.

Can we move faster? What does an accelerated timeline cost?

Sometimes, and it's a budget conversation more than a scheduling one. The two long poles are the city and material lead times — neither is fixed by working weekends. Compressing a schedule usually means paying for it somewhere: in-stock finishes instead of special order, expediting fees, overtime, or ordering long-lead items before the design is fully locked, which carries its own risk if something changes. We'll tell you exactly which levers apply to your project and what each one costs at the walkthrough, so you can decide whether the speed is worth the premium.

How do you make sure it doesn't leak in five years?

We build wet areas on Schluter systems, and that spec is written into your scope before demo rather than decided on site. Tile is a finish, not a waterproofing layer — what keeps water out of your framing is the membrane and the detailing behind it, and that's where cheaper bids quietly save money. Ask any contractor you're considering to name their waterproofing system in writing. The answer tells you most of what you need to know.

How do you handle budget transparency?

Scope is locked before demo, with every line item visible. Change orders happen when you change something, or when we open a wall and find something nobody could have seen. Those get priced and approved in writing before work continues. You will never get a surprise invoice.

What happens after we submit the form?

Our team reviews your project details. If your timeline and scope align, we'll reach out to schedule a brief strategy call to discuss next steps — and from there, an on-site walkthrough.

Are you licensed and insured?

Yes. Casa De RJ holds California CSLB license #1084784 — you can look it up directly on the CSLB website, and we'd encourage you to. A searchable license number is proof; "licensed and insured" is a claim every competitor also makes.

Start here

Start your bathroom plan

Tell us about the space and the timeline. We'll tell you what's realistic — including if we're not the right fit.

  • Takes about two minutes
  • No obligation and no pressure
  • You'll hear back within TWO (2) business days

Fastest way to start: have your address, a few photos of the current bathroom (including the shower and the ceiling fan), any inspiration links, and your target timeline ready.